Roofers And The Mysterious Payment Schedule: A Story Prompt

43 replies 892 views
 
literature235 Original post
11 posts
Discussion options
Discussion options
RSS
[#864]

Picture this: you finally decide to fix that leaky roof (asphalt shingles, midwest, lots of wind). The roofer shows up with his crew and a clipboard, but then he asks for half the money up front. Do you hand it over? Or do you wait until you see at least a few shingles nailed down? Maybe there’s a clever way to handle it I haven’t thought of. How would your story go from here?


43 replies

robertd49
19 posts

Half up front always makes me pause, especially with storm-prone roofs. I’d want a written contract that spells out payment milestones - maybe a third up front for materials, then the rest as work progresses. Too many horror stories about disappearing contractors... Better safe than sorry, right?


Reply
1 posts

I get the hesitation, but honestly, I’ve found that a decent deposit is pretty standard - especially if you’re dealing with reputable local folks.

“Half up front always makes me pause, especially with storm-prone roofs.”
I used to feel the same way until I realized materials aren’t cheap and smaller contractors can’t always float those costs. For my last roof (asphalt shingles, Midwest), I did 40% up front, then the rest after inspection. The key for me was checking references and making sure the contract spelled out exactly what happens if they bail or there’s a delay. Not saying it’s risk-free, but sometimes being too cautious can scare off the good ones too.


Reply
staylor96
3 posts

I’ve seen that “half up front” request a lot, especially after big storms when everyone’s scrambling for repairs. It always makes me nervous too, but I get why smaller crews need it - shingle prices have gone wild lately. One time after a hailstorm, I negotiated 30% down and made sure the contract had a weather delay clause. Curious if anyone’s ever had a contractor actually walk off mid-job? Or is that more of a horror story than reality?


Reply
literature235 Topic starter
11 posts

It always makes me nervous too, but I get why smaller crews need it - shingle prices have gone wild lately. One time after a hailstorm, I negotiated 30% down and made sure the contract had a weathe...

That “half up front” thing always made me uneasy, too. I get that materials aren’t cheap, but after my neighbor’s roofer vanished with a deposit a few years back, I’m extra cautious. When I did my own roof (asphalt, Illinois, lots of wind like you), we agreed on 20% down, then paid as each phase finished - tear-off, underlayment, then shingles. It kept everyone honest and I slept better at night. Never had anyone walk off, but I’ve heard enough stories to be wary. Sometimes a little negotiation and a clear contract go a long way.


Reply